12.07.15
The Sutter Health Eden Medical Center is a 130-bed, acute care hospital totaling 230,000 square feet. The new state-of-the-art next generation healthcare facility was built to exacting standards developed through an integrated planning process with the construction, design and patient care team that ensured alignment of clinical program elements, building and healthcare features and community goals.
Harris completed the project around existing hospital traffic and activities, while working to cause minimal disruption. During preconstruction, BIM/VDC along with ...
Read More
12.07.15
Utilizing Lean construction techniques and an integrated project delivery shared risk/reward contract, Harris performed design-assist HVAC and virtual design and construction (VDC) services for the new Alta Bates Medical Center Merritt Pavilion. The new, 250,000-square foot medical facility is a state-of-the-art medical/surgical patient tower with acute rehabilitation services, on-premises pharmacy and nuclear medicine. This iconic building also brings the campus into compliance with California’s strict seismic safety requirements.
The Merritt Pavilion was designed to ...
Read More
11.10.15
Harris helped Novus Energy LLC design and build a mobile demonstration plant. The demonstration plant is a trailer-mounted, waste-to-energy conversion system which is fully integrated with its own automated control system. The system is a completely functional plant capable of converting high-solid organic materials to methane-rich bio-gas, organic fertilizer and clean water.
The demonstration plant has been used to showcase new technology and fine-tune the design configuration for full-scale plants. It has been operating since 2010 and has ...
Read More
10.05.15
Harris provided the HVAC sheet metal required for Los Angeles International Airport’s overhaul of their central plant. Overall, Harris fabricated 120,000 pounds of sheet metal for the project and ensured proper procedures were followed for the client’s LEED Gold certification goals.
The transportation of people and equipment was a major challenge for the project team. The lay down area was five miles away from the project site through heavy traffic. To reduce time spent on the ...
Read More
09.25.15
Harris construction and controls teams collaborated on this state-of-the-art inpatient pharmacy conveniently located on the first floor of the hospital. The pharmacy relocation project was a complete design-build effort aiming to transform an existing hospital space into a new inpatient pharmacy that satisfied the needs of the Minneapolis Children’s Hospital.
The goal of the design and subsequent construction was to provide the hospital with a fail-safe, stand-alone mechanical system for three new clean rooms. To make ...
Read More
12.02.14
The Physician Assistant Program at Bethel University provides training to students seeking jobs to fill an important and growing new role within clinics and hospital systems. Bethel University was on a fast-track to create a learning space for their new program, which involved an upgrade an existing office space to a state-of-the-art hands-on lab and classroom that would include patient simulators. Driven by enrollment, the renovation had to be done in a relatively short space of time.
...
Read More
08.06.14
Building 10
When the National Institutes of Health (NIH) needed to upgrade its central chilled water system, it turned to its longtime partner Harris for vital infrastructure work with a minimum of service disruption to NIH’s critical scientists and medical professionals.
Building 14
Structural steel and catwalks were carefully set in place for mechanical room hookups from the central plant. Hundreds of feet of chilled water mains, steam and steam condensate up to 14 inches in diameter ...
Read More
08.06.14
Washington National Cathedral was first air conditioned in the mid-1970s by Harris who installed large air handlers to bring in air from the outside and recycle air from the interior. However, the Cathedral did not have the resources at the time to add the pipes and chiller to cool the vast interior. In 2000, several donors stepped forward donating the necessary funds needed to complete the job, and Harris was once again called on to provide all mechanical services.
Read More
08.06.14
Historically, Washington Hospital Center supplied the Children’s National Medical Center (CNMC) its chilled water needs. Because of the planned expansion of the Washington Hospital Center, CNMC had to build its own facility within a tight timeframe.
CNMC turned to Harris, a long time preferred mechanical contractor, to serve as the prime contractor for the entire project. A new building structure was built adjacent to the glass facade of the building and the emergency room vehicle ramp.
Read More
07.17.14
The new GateWay Community College (GCC) Integrated Education Building was designed to house five separate programs in uniquely recognizable structures that connect, integrate and function as one building. Built to LEED standards, the three-story building features offices for student services, counseling and advising, an indoor/outdoor art room, new library, tutoring labs, additional classrooms and a new science wing.
To cool the building, Harris brought new 14-inch chilled water lines across the campus via an underground utility ...
Read More