Lake Stevens High School

Lake Stevens High School was a multi-phased modernization of the existing facility on a 35.6-acre site. The project was a mix of additions, modernization and replacements. The school remained occupied and operational throughout all phases of construction and was surrounded by single-family residential neighborhoods. The student population is 1,800 consisting of grades 10-12. Design involved new or renovated general classrooms, art classrooms, science, technology, engineering, music, special education, athletics, performing arts, two gymnasiums, an existing pool, cafeteria/commons, library and administrative offices.

The delivery method for plumbing and HVAC packages was mechanical contractor/construction manager or MC/CM and consisted of pre-construction and construction phases.

The HVAC system consists of strategic cooling utilizing packaged rooftop DX equipment and high performance VAV heating system. The existing boiler plant was expanded, presenting some challenging water treatment strategies due to the campus-style layout of the facilities. In addition, we renovated the existing pool and pool boiler room and upgraded the equipment.

Read more about Our expertise in:

See more projects
142,235
square feet
  • Location
    Lake Stevens, WA
  • Owner
    Lake Stevens School District
  • General Contractor
    Cornerstone General Contractor
  • Architect
    Dykeman Architects
  • Engineering Consultant
    Hargis Engineers
  • Market
    Education
  • Expertise
    Construction
  • Delivery Method
    Design-Assist
  • Scope
    BIM, Cost Estimating, HVAC, Insulation, Plumbing, Preconstruction Services, Service, Temperature Controls, Test and Balance
  • Completion Date
    2021