American Airlines Office and Data Center Renovation

Harris helped American Airlines renovate their office and data center to adjust to changing business needs. Construction took place in four phases to accommodate the occupants.

One phase of the project scope included removal of seven existing fluid cooler fan sections and replacing them with new fan sections. This work had to be scheduled with the owner so that at least two existing fluid coolers and a redundant cooler were always online. The owner’s data center could not be shut down.

After, the team demolished the existing water source heat pumps and all associated ductwork and air distribution. Twenty-eight new water source heat pumps were installed along with new ductwork, air distribution and condenser water piping. New fan coils were installed with ductwork to each of the new heat pumps to deliver fresh outside air. The project wrapped up with all new controls tied to the existing building automation system (BAS) and testing and balancing of the new systems.

The project wrapped up with all new controls tied to the existing BAS and testing and balancing of the new systems.

Read more about Our expertise in:

See more projects
28
new water source heat pumps installed
  • Location
    Tempe, AZ
  • Owner
    American Airlines Inc
  • General Contractor
    FCI Constructors Inc
  • Architect
    Corgan Inc
  • Engineering Consultant
    MSA Engineering Consultants
  • Market
    Data Centers, Office
  • Expertise
    Construction, Manufacturing, Service
  • Delivery Method
    Plan + Spec
  • Scope
    Cost Estimating, HVAC, Insulation, Manufacturing, Service, Temperature Controls, Test and Balance
  • Completion Date
    2016