Birdseye Foods Ammonia System Upgrades

In spring of 2018, Harris installed a new ammonia compressor, intercooler, and new piping and accessories at the Birdseye Plant in Waseca, MN. As part of this project, Harris demolished and removed several existing system components and installed a new compressor and intercooler as stated above. In addition, there were several pieces of equipment that had to be relocated within the plant in order for the new equipment to be installed. Harris worked closely with the owner, engineer, and equipment rigging company to ensure all equipment got installed, piped up, and tested on time in order to accommodate the owner’s cooling needs related to their food processing demand.

Read more about Our expertise in:

See more projects
10,000
square feet
  • Location
    Waseca, MN
  • Owner
    Confidential Owner
  • General Contractor
    Harris
  • Engineering Consultant
    EMR Group
  • Market
    Food Processing, Manufacturing
  • Expertise
    Construction
  • Delivery Method
    Plan + Spec
  • Scope
    Insulation, Mechanical Piping
  • Completion Date
    2018