share
print page

Whidbey General Hospital Addition + Renovation

The Whidbey General Hospital Addition and Renovation project consisted of full mechanical scope for an addition and renovation to the existing facility. The addition consisted of 45 bed patient rooms, ICU rooms and labor and delivery rooms. The renovation included build out of pharmacy, lab and perioperative spaces. The HVAC systems included new penthouse air handlers feeding an VRF system.

The hospital’s domestic water supply source was an encased well and the water quality was poor. A water treatment system was installed and the domestic water piping distribution system was fused polypropylene. The use of the fused poly pipe was challenging which led to thorough and continuous supplier/vendor training and QA/QC field checks. This avoided risk of system wide leaks.

This project was also involved a design/assist contract modification for the build-out of a code compliant pharmacy.

Read more about Our expertise in:

See more projects
49,373
square feet
  • Location
    Coupeville, WA
  • Owner
    WhidbeyHealth
  • General Contractor
    Andersen Construction
  • Architect
    HDR
  • Engineering Consultant
    Coffman Engineers Inc
  • Market
    Healthcare
  • Expertise
    Construction
  • Delivery Method
    Plan + Spec
  • Scope
    BIM, HVAC, Insulation, Plumbing, Temperature Controls, Test and Balance
  • Completion Date
    2018