06.10.14
The 85,000-square foot Lookout Mountain Elementary School project was unique in that Harris, working for Adolfson & Peterson Construction, was responsible for the installation of the HVAC system involving the installation of a geothermal field and water source heat pumps. A portion of the design centered around a more traditional heating system but around 50 percent of the complex was served by this geo system.
Read More
06.07.14
Harris provided a broad range of mechanical services for the construction of the wetlands and environmental science center Cascade Meadow.
Designed to operate as a high performance green building, the project incorporated energy-efficient construction, passive solar design, and focused on meeting indoor environmental quality and renewable energy standards. The facility is used to educate adults and children on energy conservation and healthy indoor spaces.
To meet the project’s goal to use 53 percent less energy ...
Read More
06.05.14
The Minnesota Correctional Facility – Faribault is a medium-security, level-three facility. Harris provided mechanical services for the multi-phased expansion and renovation. The project included the addition of three new living units, program buildings (psychological, religious, volunteer and education services), dining/kitchen area and the renovation of the senior care/special needs facility. Both the expansion and renovation occurred on a fast-track with multiple bid packs allowing prison operations to continue during construction.
Harris provided plumbing, heating piping and ...
Read More
06.04.14
Harris installed mechanical systems that were designed to accommodate the anticipated expansion of Abbott Northwestern Hospital into a newly constructed a 6,600-square foot mechanical penthouse built on the rooftop of the hospital’s East Tower.
To meet the aggressive schedule set for the project, Harris utilized its in-house BIM capabilities to create an exact replica of the finished HVAC, piping and plumbing systems, and manufactured all ducts and pipework at the Harris’ Zumbrota fabrication shop. This approach ...
Read More
06.04.14
Always mindful of the future, Hormel and the Harris design team chose to incorporate green building practices into the construction of the office 28,000-square foot addition that was awarded LEED Gold certification.
Some of the sustainable aspects of the building included:
Geothermal heating and cooling systems, utilizing vertical bore well loops
Low-flow plumbing fixtures for water conservation
Rainwater collection cistern
All heating and cooling systems are controlled via ...
Read More
06.03.14
Harris was awarded the mechanical contract providing plumbing, piping, HVAC and BIM modeling and detailing services for the new Voxman Music Building on the University of Iowa (UI) campus. One of the most striking features of this five-story building is its large glass exterior designed to make the facility more open to the public and highlight its new location in the downtown area. It also features various noise reduction and environmental design elements and materials in the design and ...
Read More
09.03.13
Looking to venture into a new region and join forces with a market leader, Harris partnered with Gopher Resource on the expansion and modification of a smelter/battery recycling plant for its wholly-owned subsidiary EnviroFocus Technologies.
The new state-of-the-art facility in East Tampa replaced the facility’s existing plant doubling its recycling capabilities from 26,000 tons of lead per year to 130,000 tons of lead annually, or approximately 50,000 lead-acid batteries per day.
Under a four-phased staggered approach ...
Read More
09.03.13
Great River Energy (GRE) hired Harris to serve as general contractor for the construction of the Elk River Peaking Station, a 175-megawatt natural gas peaking facility located in Elk River, Minnesota.
The plant featured a simple-cycle combustion turbine generator able to reach 150-megawatt of power output in 10 minutes, an output that is faster than any other industrial turbine of its size operating in the world (source: greatriverenergy.com). Designed to meet the community’s energy needs during ...
Read More
09.03.13
To meet the energy demands of a community that was experiencing growth, Great River Energy (GRE) constructed a state-of-the art combustion turbine plant in Cambridge, Minnesota with a generation capability of approximately 154 megawatts. The natural gas-fired power generation facility was built on a site already owned by GRE and adjacent to an existing smaller generating – Cambridge Station Unit 1.
Harris was contracted to serve as the general contractor for this project providing the piping systems to support the ...
Read More
09.03.13
Harris provided mechanical services for the Fairview Lakes Medical Center expansion and renovation. Harris installed four air handling units ranging in size from 12,000 to 20,000 cubic feet per minute. This installation and the associated tie-ins to existing HVAC systems were completed on off-hours to limit any disruption to patient services. Mechanical improvements also included the addition of a second emergency generator, as well as a new chiller and cooling towers.
In addition, Harris removed, replaced and rerouted many ...
Read More