News
Archive: 2013

09.03.13

St. Francis Regional Medical Center Expansion

Harris was contracted to provide design-assist mechanical services for this hospital expansion and remodeling project. The project included a new central plant containing boilers, chillers and generators, as well as an addition adding medical/surgical rooms and administration space. The addition was built with the capacity to add another four floors and additional space as necessary. Several mechanical systems were manufactured by Harris off-site to streamline installations. As this is a healthcare facility, all the manufactured pieces ...Read More
09.03.13

East Valley Rehabilitation Hospital

HealthSouth East Valley Rehabilitation Hospital is a new, 40-bed acute medical rehabilitation hospital totaling 47,500 square feet. Harris provided complete plumbing and mechanical systems for the new hospital including medical gas piping, oxygen and vacuum systems. The project included the first installation of Trane’s water-cooled variable air volume (VAV) air handling systems; complete with an internal-cooling tower to provide maximum efficiency to the system. Harris also installed a complete medium and low-pressure ductwork distribution system including VAV ...Read More
09.03.13

East Valley Rehabilitation Hospital Addition

Thanks to the efforts of the project team during the original East Valley Rehabilitation Hospital build-out, Harris was invited back to perform the construction of the 20-bed addition. With the addition of new patient rooms, this new facility also required room for additional support staff including an expanded dining area and new nursing stations. Harris performed all HVAC, plumbing and medical gas piping for the 11,060-square foot expansion. Tie-ins were made to the existing plumbing and medical ...Read More