10.13.20
A confidential client retrofitted additional space in their existing data center to house more servers. With the increase in capacity came the need to upgrade the mechanical systems responsible for keeping the data center cool. Harris was contracted to install the data center’s new backup generator and associated HVAC and piping.
In addition to the generator, Harris provided and installed new fuel oil piping as well as the day tank and stack for the new generator. ...
Read More
10.12.20
DC2 is a build-out of a Tier IV mission critical data center. The original facility was constructed in 2006, with enough space for future buildouts as the client’s expansion needs dictated. This data floor expansion began in January 2011, with a fully commissioned completion date of June 2011.
Harris worked with one of the largest data center builders in North America to provide total mechanical construction needs for a confidential client; with the general contractor providing the major pieces ...
Read More
10.12.20
DataBank’s Granite Point SLC2 data center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the facility offers network connectivity to multiple Tier 1 and Tier 2 providers. The facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment.
Harris installed 11 owner provided CRAH units in SLC2. The Data Hall was to remain operational throughout the duration of the project, ...