04.17.14
Harris played a central role in overhauling the historic Valspar Applied Science and Technology (VAST) Center. After overseeing the demolition of existing mechanical and plumbing systems, Harris installed full plumbing and HVAC to the lower half of the building.
The Valspar labs test various types of paints and powders that require higher airflow rates and non-corrosive ductwork. With the large array of mechanical equipment running throughout the building, a Harris-led 3-D coordination effort between contractors was required ...
Read More
04.08.14
Block E is a mixed-use development that consists of two floors of retail/restaurant space, a third-floor movie theater, two floors of underground parking and a 22-story hotel. The $150 million project included 268,259 square feet of retail space, a 230,637-square foot parking garage and a 205,000-square foot hotel.
McCaffery Interests Inc (retail) and Graves Hospitality (hotel) developed the project in response to a City-issued Request for Proposal to redevelop a full downtown block that was serving as surface ...
Read More
01.23.14
In August 2008, Harris began a 275,000-square foot addition to the existing Minneapolis Children’s Hospital consisting of an eight-story vertical expansion, a new central plant and front entry along with extensive renovations.
Harris provided complete design-build engineering and installation of all mechanical, plumbing, medical gases and temperature control systems for this project. Manufacturing ductwork and piping was key to streamline the installation and meet an aggressive “fast-track” schedule.
The eight-story addition included an energy plant ...
Read More
12.03.13
Harris was hired by scrap metal recyclist American Iron & Steel Company as the general contractor to build a new, state-of-the-art enclosed metal shredder. The project included building the facility to house the shredder, along with the plumbing, HVAC, electrical, process equipment (shredder and conveyors), dust control system, walkways and platforms.
The metal shredder was built with several unique features that allowed it to operate safely and conform to environmental regulations. Rather than discharging stormwater, Harris installed ...
Read More
09.03.13
Great River Energy (GRE) hired Harris to serve as general contractor for the construction of the Elk River Peaking Station, a 175-megawatt natural gas peaking facility located in Elk River, Minnesota.
The plant featured a simple-cycle combustion turbine generator able to reach 150-megawatt of power output in 10 minutes, an output that is faster than any other industrial turbine of its size operating in the world (source: greatriverenergy.com). Designed to meet the community’s energy needs during ...
Read More
09.03.13
Harris worked extensively with stakeholders and St. Olaf College to design and install a new, sustainable science center. Much of the piping, duct systems and fixture assemblies for the 180,000-square foot building were prefabricated in Harris’ fabrication shop, allowing our company to comply with LEED certification requirements, complete work ahead of schedule and reduce time in the field.
To adhere to LEED certification requirements, Harris used low-VOC emitting adhesives and sealants for duct and pipe connections. A ...
Read More
09.03.13
Harris provided mechanical services for the Fairview Lakes Medical Center expansion and renovation. Harris installed four air handling units ranging in size from 12,000 to 20,000 cubic feet per minute. This installation and the associated tie-ins to existing HVAC systems were completed on off-hours to limit any disruption to patient services. Mechanical improvements also included the addition of a second emergency generator, as well as a new chiller and cooling towers.
In addition, Harris removed, replaced and rerouted many ...
Read More