The new six-story, 790,000-square foot Veterans Affairs Medical Center represents the largest construction contract ever awarded by the United States Department of Veteran Affairs. The hospital provides complete medical services, including ambulatory care, radiology, laboratories, pharmacy, diagnostic and treatment clinics, and educational facilities.
Harris fabricated and installed 1,900,000 pounds of ductwork for Phase IV of the $364.9 million hospital project. Partially staffed on-site, Harris’ BIM team met weekly to coordinate with other trades for interference, using the project model ...
Read More
12.07.15
The Sutter Health Eden Medical Center is a 130-bed, acute care hospital totaling 230,000 square feet. The new state-of-the-art next generation healthcare facility was built to exacting standards developed through an integrated planning process with the construction, design and patient care team that ensured alignment of clinical program elements, building and healthcare features and community goals.
Harris completed the project around existing hospital traffic and activities, while working to cause minimal disruption. During preconstruction, BIM/VDC along with ...
Read More
12.07.15
Utilizing Lean construction techniques and an integrated project delivery shared risk/reward contract, Harris performed design-assist HVAC and virtual design and construction (VDC) services for the new Alta Bates Medical Center Merritt Pavilion. The new, 250,000-square foot medical facility is a state-of-the-art medical/surgical patient tower with acute rehabilitation services, on-premises pharmacy and nuclear medicine. This iconic building also brings the campus into compliance with California’s strict seismic safety requirements.
The Merritt Pavilion was designed to ...
Read More
09.25.15
Harris construction and controls teams collaborated on this state-of-the-art inpatient pharmacy conveniently located on the first floor of the hospital. The pharmacy relocation project was a complete design-build effort aiming to transform an existing hospital space into a new inpatient pharmacy that satisfied the needs of the Minneapolis Children’s Hospital.
The goal of the design and subsequent construction was to provide the hospital with a fail-safe, stand-alone mechanical system for three new clean rooms. To make ...
Read More
08.06.14
Historically, Washington Hospital Center supplied the Children’s National Medical Center (CNMC) its chilled water needs. Because of the planned expansion of the Washington Hospital Center, CNMC had to build its own facility within a tight timeframe.
CNMC turned to Harris, a long time preferred mechanical contractor, to serve as the prime contractor for the entire project. A new building structure was built adjacent to the glass facade of the building and the emergency room vehicle ramp.
Read More
07.10.14
The University of Kentucky’s (UK) new Pavilion A at the Albert B. Chandler Hospital is the cornerstone of a 20-year construction plan for this academic medical campus of the future. This 1,100,000-square foot hospital was completed in two phases, allowing for the step-by-step replacement of the hospital’s existing pavilion. Areas included an emergency department, surgery center, trauma center, radiology, specialty floors and patient rooms and an auditorium.
Harris performed the HVAC build-out for this facility, ...
Read More
07.10.14
On November 18th, 2016, the Southeast Louisiana Veterans Health Care System celebrated the grand opening of its New Orleans medical center with a ribbon cutting. Harris manufactured and installed more than 2,000,000 pounds of ductwork for the new medical campus and provided design-assist services.
This is the second major Veterans Affairs (VA) hospital project Harris has performed with general contractor partner Clark Construction, the first being the VA Medical Center in Las Vegas.
After Hurricane Katrina in 2005, ...
Read More
06.27.14
Harris partnered with JW McClenahan and DPR Construction to design, coordinate and install complete HVAC systems for the new Lucile Packard Children’s Hospital (LPCH). Utilizing Lean Construction techniques and BIM/VDC technology, Harris fabricated and installed over 1.7 million pounds of ductwork, 19 air handlers and related HVAC equipment serving this 521,000-square foot state-of-the-art LEED Gold medical facility in the heart of the Silicon Valley.
Located on the Stanford University campus, the LPCH doubles in size with the ...
Read More
06.12.14
The Mayo Clinic is at the center of the community in Rochester, Minnesota employing thousands of people and treating patients from all over the world. It offers an integrated healthcare environment where patients can benefit from the knowledge of many different specialists.
The 20-story, 2,000,000-square foot Gonda Building was designed with the present and future in mind. It is a highly flexible facility that allows expansion and redesign for the ever-changing healthcare environment. The building has a ...
Read More
06.10.14
Located adjacent to the existing Portland Medical Center, the Providence North Pavilion Medical and Cancer Center is an 11-story, 490,000-square foot building that houses physicians who specialize in major tumor types as well as internationally recognized researchers performing bench-to-bedside clinical trials. The facility also includes a learning center, a holistic health and counseling center, laundry facilities and a spa.
A state-of-the-art, 100 percent outside air system with high accuracy airflow terminal units provide constant pressure relationships, helping minimize ...
Read More