08.11.20

Prescott VA Mental Health Building

Harris was chosen to install the plumbing and HVAC for the Prescott VA Mental Health Building. The plumbing systems were cast iron underground waste piping, cast iron above ground waste and vent piping. The domestic water systems are standard copper with re-circulated hot water systems. The systems did not require any special medical gases or special equipment, making installation easier. On the HVAC side, Harris installed a 48 well geothermal piping system, including site piping to the mechanical ...Read More
08.11.20

Marshfield Cancer Center + Hospital Expansion

Harris recently completed the Marshfield Clinic Health System’s 200,000-square foot hospital and a 40,000-square foot cancer center expansion. The project includes a new central heating and cooling plant. The clinic’s mechanical systems are currently connected by underground tunnels with the hospital feeding the cancer center from a central chilled water, hot water and medical gas system. This fast track project was split into two phases with phase one, the cancer center having less than a ...Read More
08.11.20

Banner Del Webb Tower D

The Banner del Web project was a change of the lower floor of the building from a fully exhausted constant volume system to a variable air-volume system with return air. Harris was selected as the prime contractor based on qualifications and approach to execute the project. The project required modifying the existing 168,000 cfm AHU-24 and the replacement of the existing return air handling units. The (2) 200 hp. 84,000 cfm fans were removed from an in-phased plan so one fan could remain ...Read More
08.11.20

Alex G. Spanos Heart & Vascular Center

The new Alex G. Spanos Heart & Vascular Center was built to address growing community needs. The new 123,000-square foot, four-story facility has space for innovative technology and increased patient capacity. Throughout preconstruction, the project team successfully collaborated and resolved logistical complexities associated with an extremely tight site, design redirection and modifications to the project. The team overcame the obstacles associated with a very limited project space and the challenges associated with working in a operational medical ...Read More
03.22.18

HCMC Ambulatory Outpatient Specialty Center

The Hennepin County Medical Center (HCMC) Ambulatory Outpatient Specialty Center was initially designed to relocate over 20 different departments associated with HCMC into one building. As the design progressed, more square footage was added to accommodate additional departments. Increased project square footage as well as more densely used space truly pushed the limits of the design and the budget. To help smooth the process, Harris worked with the design and the construction team to track the budget from schematic design ...Read More
05.16.17

TRIA Orthopaedic Center

Harris teamed with Kraus-Anderson Construction to build the new state-of-the-art, 84,000-square foot TRIA Orthopaedic Center in Woodbury, Minnesota. The facility offers orthopaedic and sports medicine services including a walk-in clinic, ambulatory surgery center and on-site rehabilitation services. Harris provided HVAC, plumbing and medical gas services for the facility, including operating rooms, MRI and therapy pool. Manufacturing greatly increased Harris’ installation speed and efficiency. The team manufactured the center’s VAV boxes into racks and was able to ...Read More
04.28.16

La Paz Regional Hospital

La Paz Regional Hospital’s new, 9,158 square foot surgical addition provides two surgical suites for major operations and two procedure suites for minor operations. The building was designed to create an open yet efficient work space, allowing patients to flow smoothly between areas while maximizing the number of people using the facility. Harris Mechanical Southwest provided the complete plumbing and medical systems for the addition. The project required multiple shutdowns of the existing hospital’s facilities in ...Read More
04.25.16

Allina Central Laboratory

The Central Laboratory project consolidated the services provided by over 50 laboratories into one core lab located on the Abbott Northwestern campus in Minneapolis. Built on the second floor of an Allina warehouse, the total construction area covers approximately 76,000 square feet. The Central Laboratory Facility serves 11 Allina hospitals, 49 Allina medical clinics, 13 Aspen clinics, five Quello clinics and several specialty care services. More than 400 people working in Abbott Northwestern campus labs moved into the new lab which is one of the ...Read More
04.25.16

Abbott & Children’s Hospitals Mother Baby Center

Harris performed the plumbing, HVAC and temperature controls work for the new Mother Baby Center at Abbott Northwestern Hospital and Children’s Hospital. The birth center, located on the Children’s Minneapolis campus, has a dedicated entrance for expectant moms and families. The 96,000-square foot, four-story building includes 44 post-partum rooms, 11 high-risk antepartum beds, 13 labor and delivery rooms, three operating rooms and skyway access to Abbott Northwestern Hospital. The facility is steps away from Children’s new NICU, ...Read More
12.18.15

Park Nicollet Women’s Center at Methodist Hospital

Harris provided both plumbing and HVAC services for the Park Nicollet Women’s Center at Methodist Hospital located in St. Louis Park, Minnesota. The design-build project included a 30,000-square foot build-out on the fifth floor of the existing hospital. Work included the installation of a new 35,000 cubic feet per minute custom air handling unit installed in the penthouse above. Harris took several steps to ensure construction did not disrupt the hospital’s day-to-day operations. Plumbing work on ...Read More