RBC Plaza BAS Retrofit

Harris was selected by Cushman & Wakefield NorthMarq to upgrade the building automation system. The RBC Plaza had an existing Honeywell XL Plus system with an integrated fire alarm. The upgrades required the mechanical BAS to be separated from the fire alarm system in the 40-story skyscraper in downtown Minneapolis. Once the BAS and Fire Alarm systems were split, Harris was able to take control of all mechanical equipment in the penthouse and lower mechanical rooms as ...Read More
10.12.22

Providence Academy Performing Arts Auditorium

Harris was given a fully designed design and spec job for the addition of an auditorium to Providence Academy school in Plymouth, Minnesota. Harris was responsible for the addition of tertiary systems for heating and chilled water, five air handling units and numerous VAV boxes. One air handling unit installed feeds the auditorium seating area and it was essential to the project design that there was no air noise in this area of ...Read More
10.12.22

Bielenberg Sports Center Field House

Harris installed KMC Controls in the Bielenberg Sports Center Field House to control the TRAK heat pump system. We installed 170 temperature sensors throughout the field house and the outdoor pleasure rink to control the TRAK system and the building temperature. Nine of the sensors are in the manmade pond by the heat exchangers and in the piping to dissipate the heat in the summer. This keeps the water loop cool, this technique will help make the TRAK ...Read More
10.12.22

River Towers HVAC Revitalization + Remediation

For the River Towers HVAC Revitalization and Remediation project, Harris was the general contractor with multiple subcontractors direct with the owner. The project was design-build with mechanical, electrical, structural and architectural scope of work. The project consisted of condos with (2) towers, one 30 stories and the other 18 stories. There were also boilers, snowmelt, pool heating, plumbing heating and a 200-foot lattice flue structure up through the center of the building. This was an HVAC retrofit project that also ...Read More
10.05.22

Malouf Mezzanine Expansion

Harris was awarded the Malouf Mezzanine Expansion design-build project for Malouf Fine Linens. The scope of the project included turning warehouse space into a two-level mezzanine office/retail/photo area for the client. Malouf came to Harris, with the help of Big D Construction, with a design concept they wanted to execute, including a new VRF system to suit their needs for the cooler climate of their location. Harris designed an HVAC and plumbing system that included 4...Read More
10.04.22

Innovation Pointe 2

Harris was selected by Layton Construction and Argent Group as the design-builder for the mechanical and plumbing work on the new, Innovation Pointe development. This development consists of a 40-acre master plan with 600,000-square feet of development. The Innovation Pointe 2 project was a five-story, 141,000-square-foot office building with supporting parking structure. It was designed with the needs of today’s businesses in mind, with leading edge technology and high-end finishes. With the modern progressive architecture ...Read More
10.04.22

G4CE Family Fun Center

Harris remodeled the HVAC and plumbing systems in a 101,000 square-foot warehouse. The space was originally a retail location and was made into a family fun/amusement center. We started underslab and cut in new plumbing for six new restrooms. The existing RTUs were retrofitted with new duct work to accommodate the new spaces. The new spaces included a laser tag area, mini golf, bowling alley and party rooms. Several issues were resolved by our team. These included ...Read More
10.04.22

Williams International Blue Phoenix Addition

The Williams International – Blue Phoenix Ogden Addition project was a new manufacturing plant for Williams International in Ogden, Utah. This was a fast-paced project where the mechanical and plumbing design was happening while the shell of the building was going up. From design initiation to completion, the total duration was 8 months. This included the design of a highly efficient process cooling system that incorporated four fluid coolers, four air handlers, and three water cooled chillers. This project ...Read More
03.22.18

SJU McKeown Community Center

McKeown Community Center is the community center for Flynntown — the lower campus of Saint John’s University (SJU) — and is designed to the LEED Silver standard. To reduce energy usage efficient lighting, HVAC and plumbing systems were installed. Harris designed and installed controls systems that monitor energy usage in real time. Data is used by SJU physical plant workers and environmental studies students to adjust performance. Read More
03.22.18

SJU Hill Museum & Manuscript Library

The Hill Museum & Manuscript Library, located on the architecturally distinguished Saint John’s University campus, houses the world’s largest collection of images of manuscripts from the Middle East, Europe and Ethiopia, and a collection of prints ranging from the 15th century to the present. In the office, workspace and archive areas, Harris installed new heating, ventilation and air conditioning controls systems, providing an optimal environment for the museum’s collection and its users. Read More