News
Archive: 2022

10.04.22

Hill AFB Fire Crash Rescue Building

The Hill Air Force Base located in northern Utah is the sixth largest employer in the state and home of the Ogden Air Logistics Complex which manages a wide range of aircrafts. The Hill AFB Fire Crash Rescue Facility supports the base’s flight line operations and is a critical life safety facility. Harris took a Design-Build role on the project, working closely with Colvin Engineering to design and install the plumbing, piping and HVAC systems in ...Read More
10.04.22

Williams International Blue Phoenix Addition

The Williams International – Blue Phoenix Ogden Addition project was a new manufacturing plant for Williams International in Ogden, Utah. This was a fast-paced project where the mechanical and plumbing design was happening while the shell of the building was going up. From design initiation to completion, the total duration was 8 months. This included the design of a highly efficient process cooling system that incorporated four fluid coolers, four air handlers, and three water cooled chillers. This project ...Read More
10.03.22

Confidential Electric Vehicle Manufacturing Facility Phase I

Harris was hired as the mechanical contractor for the Confidential Electric Vehicle Manufacturing Facility Phase I project. The manufacturing facility is being used to build a new electric sedan model. For the project, Harris provided the services of BIM, design and engineering, HVAC, plumbing and preconstruction services while subcontracting crane, insulation and rigging. The project had a delayed start with an already aggressive schedule. As a solution, Harris held meetings with the owner ...Read More
10.03.22

Madison Square Garden Sphere

Harris is once again involved in constructing the latest iconic location on the Las Vegas Strip. Once completed in 2023, MSG Sphere will be a state-of-the-art 20,000 seat concert and special event venue that will provide an amazing once-in-a-lifetime visual and auditory experience. The MSG Sphere will have 170,000 sq. ft. of interior ultra HD LED screens and all sound will be delivered by “beamforming” technology, instead of overhead hanging speakers, allowing all attendees to experience any event the exact same way ...Read More
10.03.22

Verizon Data Centers

For over 30 years, Harris has been the HVAC contractor of choice for Verizon Communications, a large communications and data provider based out of Basking Ridge, NJ. We received our master subcontractor agreement with Verizon in 1990. In preparation for the rollout of the nationwide 5G wireless network, Verizon has made tremendous investments to update their existing data centers to facilitate the new servers needed to implement this new technology. They own over 600 switching sites and data centers in the DMV ...Read More
10.03.22

Pepco Waterfront Substation

The Pepco Waterfront Substation project was a new substation installation for the Potomac Electric Power Company of Washington, D.C. It was a design-assist job with Coakley Williams Construction and their mechanical engineer, META Engineers. The building had to be designed to house and accommodate a new ABB turbine technology that Pepco was using to make power with a smaller footprint than their traditional power plants. The site in Southeast Washington, D.C. was selected because of its proximity ...Read More
10.03.22

Martin Bostetter Courthouse

The Martin Bostetter Courthouse is a historic building located in Old Town Alexandria, Virginia. The project presented many challenges from design to completion. The project was completed one-hundred percent during the night hours. This alone made it difficult to manage but location was key. Harris had seven tractor trailers loaded with equipment parked in an area that was barely large enough for a passenger vehicle to pass. Noise was also an issue during the night hours. Other ...Read More
10.03.22

Confidential Data Centers

Harris has been serving one of the world’s largest cloud storage providers for several years and has become a trusted partner for their critical data center campuses in northern Virginia and Ohio. All projects for this owner are evaporative cooling designs and are on average 250,000 square feet each. The projects utilize industrial water evaporative coolers and hot aisle containment to cool the equipment. Power rooms are also cooled using evaporative CRAH units and exhaust fans. Battery rooms and ...Read More
10.03.22

UCSF Benioff Oakland Children’s Hospital

Harris was selected as the mechanical contractor for this renovation of the Benioff Oakland Children’s Hospital, largely based on our long and successful history of hospital construction in the Bay Area, as well as our ability to execute the plumbing, mechanical piping and HVAC dry components under a single contract. This 28,000-square-foot 2-story remodel and upgrade consists of a new 23 bed PICU unit supported by an on suite Pharmacy, Pharmacy Hood, PBX/Sta lab and morgue.Read More
10.03.22

Stanford Hospital Clinical Lab Replacement

Stanford Clinical Lab was comprised of four initial phases. The initial phase consisted of a rehabilitation work in preparation for the more robust rehabilitation in phases 2 and 4. These larger phases involved craning in a temporary air handling unit which would provide airflow into adjacent spaces while we stripped down and completely rebuilt the Clinical Lab space. The phase 2 workspace was also located directly below active operation rooms that would not allow for noise and vibration to occur ...Read More