08.11.20
In spring of 2018, Harris installed a new ammonia compressor, intercooler, and new piping and accessories at the Birdseye Plant in Waseca, MN. As part of this project, Harris demolished and removed several existing system components and installed a new compressor and intercooler as stated above. In addition, there were several pieces of equipment that had to be relocated within the plant in order for the new equipment to be installed. Harris worked closely with the owner, engineer, and equipment ...
Read More
08.11.20
Harris performed the installation of all heating, cooling, and process piping on a nearly 1,000,000 square foot expansion project at the Faribault Foods Plant in Faribault, MN. As part of the project, Harris installed two 1000 BHP boilers, two 550-ton chillers, three cooling towers, three large outside water storage tanks, and all of the other associated pumps and piping specialties related to each of the piping systems installed. Along with this, Harris also ran several thousand feet of steam, condensate, chilled ...
Read More
07.30.20
Harris Service recently completed the change out of a 130-Ton Air Cooled Chiller on the US Bank Center Place building in Rochester, MN. This was a Design-Build project with Harris being the prime contractor.
Harris’ scope of work consisted of demoing one of two existing chillers and installing a new chiller prior to summer cooling needs in the building. This work involved demo and modification of existing piping and installation of new isolation valves so that the ...
Read More
03.23.18
In June 2013, Harris was selected to provide the demolition and replacement of all existing plumbing, HVAC piping and sheet metal and temperature control systems for the restoration of the more than 100-year-old historic Minnesota State Capitol building.
After 100+ years of service, the Capitol building had reached a critical deterioration point with a crumbling exterior, antiquated mechanical and electrical infrastructure, and inadequate life safety systems.
The project team worked hard to overcome the challenges associated with ...
Read More
03.22.18
The David Eccles School of Business at the University of Utah offers students over two dozen courses for students pursuing their undergraduate and master degrees. Nestled in the heart of the “Silicone Slopes”, the University serves approximately 4,500 students annually. The Garff Executive Education building will house the University’s graduate program.
Jacobsen Construction Co selected Harris to be the mechanical and plumbing contractor for the new 150,000-square foot classroom and executive training facility.
The mechanical ...
Read More
03.22.18
Harris was selected by Big-D Construction as the mechanical and plumbing subcontractor for the new Salt Lake Community College (SLCC) Westpointe Career and Technical Education Center. Located in Salt Lake City, this two-story, 121,000-square foot building is a new, state-of-the-art education facility that houses skills labs, classrooms, faculty offices and administrative support.
This facility will include all the training equipment and tools to help advance individuals in their careers in Advanced Composites, Diesel Systems Technology, Machining, Manufacturing, ...
Read More
03.22.18
Facing the challenge of preserving sensitive historical artifacts, Harris was the selected mechanical contractor for the Steven F. Udvar-Hazy Center at the National Air and Space Museum in Chantilly, Virginia. This chiller plant upgrade project was designed to replace three existing 1,200-ton cooling towers that had reached maximum capacity, with 1,400-ton towers for the central chilled water plant, provide 250-ton air cooled chiller for the supplemental load and to add six new ice building tanks to the building’s 24 ...
Read More
03.22.18
Adjacent to the newly constructed T-Mobile Arena, the home of the completed Monte Carlo Park Theater is the cornerstone for entertainment in the new Park District on the world-famous Las Vegas Strip.
Harris was selected to install new plumbing, piping and HVAC systems for the new concert hall/theater located inside the Monte Carlo Casino. This state-of-the-art theatre features seating for 5,200 guests across three seating levels, seven bars and one of the widest stages in the world.
Read More
03.22.18
Harris was selected by Layton Construction and Argent Group as the design-builder for the mechanical and plumbing work on the new Innovation Pointe development. This development consists of a 40-acre master plan with 600,000-square feet of development.
The current project is a five-story, 140,000-square foot office building with supporting parking structure. It was designed with the needs of today’s businesses in mind, with leading edge technology and high-end finishes.
With the modern progressive architecture ...
Read More
03.22.18
Harris was selected as the mechanical and plumbing design-build partner by Bonneville Builders and PEG Development for the new four-story hotel located in Provo, Utah.
This 84,000-square foot hotel consists of 132 minimalist-style rooms that include some of the new high-end Hyatt standards including new Moen type plumbing fixtures. Harris is excited to work with Beecher Walker and Associates on another hospitality design-build project.
Read More