04.28.16

Central Arizona Project (CAP) Chiller Project

Harris, in coordination with the Central Arizona Project (CAP), replaced the existing water-cooled chillers with air-cooled chillers at the Brady, Picacho and Red Rock Pumping Plants on the CAP Aqueduct. Harris operated in a prime contracting role and self-performed the mechanical scope. This project included the removal of the existing chillers, installation of new chillers, replacement of piping and specialties, and HVAC renovations. Subcontracts were let for electrical power wiring to serve the new equipment, temperature controls, ...Read More
04.25.16

Allina Central Laboratory

The Central Laboratory project consolidated the services provided by over 50 laboratories into one core lab located on the Abbott Northwestern campus in Minneapolis. Built on the second floor of an Allina warehouse, the total construction area covers approximately 76,000 square feet. The Central Laboratory Facility serves 11 Allina hospitals, 49 Allina medical clinics, 13 Aspen clinics, five Quello clinics and several specialty care services. More than 400 people working in Abbott Northwestern campus labs moved into the new lab which is one of the ...Read More
09.23.15

U of M Combined Heat and Power Retrofit

Citing their obsolete boilers and growing energy demands, the University of Minnesota turned to Harris for help with the installation of a state-of-the-art combined heat and power plant for their Minneapolis campus. Due to zoning and permitting constraints, the new turbine, heat recovery system and modern mechanical systems had to fit in the historic Old Main Heating Plant. To head off space issues and potential clashes, Harris and its partners relied on 3-D modeling to detect and ...Read More
06.27.14

Lucile Packard Children’s Hospital Expansion Phase II

Harris partnered with JW McClenahan and DPR Construction to design, coordinate and install complete HVAC systems for the new Lucile Packard Children’s Hospital (LPCH). Utilizing Lean Construction techniques and BIM/VDC technology, Harris fabricated and installed over 1.7 million pounds of ductwork, 19 air handlers and related HVAC equipment serving this 521,000-square foot state-of-the-art LEED Gold medical facility in the heart of the Silicon Valley. Located on the Stanford University campus, the LPCH doubles in size with the ...Read More
06.12.14

Mayo Clinic Gonda Building

The Mayo Clinic is at the center of the community in Rochester, Minnesota employing thousands of people and treating patients from all over the world. It offers an integrated healthcare environment where patients can benefit from the knowledge of many different specialists. The 20-story, 2,000,000-square foot Gonda Building was designed with the present and future in mind. It is a highly flexible facility that allows expansion and redesign for the ever-changing healthcare environment. The building has a ...Read More
06.11.14

Terra Verde Corporate Campus Phase I

Harris completed the HVAC scope for the construction of the Terra Verde Corporate Campus. The new high-end office project located in the north corridor of Scottsdale, consists of four buildings. For the first phase of the project, Harris provided complete HVAC systems that included installing two rooftop fluid coolers, three condenser water pumps, shell water source heat pump systems, as well as all piping, ductwork and direct current controls. To decreases energy consumption, two energy recovery ventilators ...Read More
06.10.14

Lookout Mountain Elementary School

The 85,000-square foot Lookout Mountain Elementary School project was unique in that Harris, working for Adolfson & Peterson Construction, was responsible for the installation of the HVAC system involving the installation of a geothermal field and water source heat pumps. A portion of the design centered around a more traditional heating system but around 50 percent of the complex was served by this geo system. Read More
06.10.14

Providence North Pavilion Medical and Cancer Center

Located adjacent to the existing Portland Medical Center, the Providence North Pavilion Medical and Cancer Center is an 11-story, 490,000-square foot building that houses physicians who specialize in major tumor types as well as internationally recognized researchers performing bench-to-bedside clinical trials. The facility also includes a learning center, a holistic health and counseling center, laundry facilities and a spa. A state-of-the-art, 100 percent outside air system with high accuracy airflow terminal units provide constant pressure relationships, helping minimize ...Read More
06.04.14

Abbott East Tower Mechanical Penthouse

Harris installed mechanical systems that were designed to accommodate the anticipated expansion of Abbott Northwestern Hospital into a newly constructed a 6,600-square foot mechanical penthouse built on the rooftop of the hospital’s East Tower. To meet the aggressive schedule set for the project, Harris utilized its in-house BIM capabilities to create an exact replica of the finished HVAC, piping and plumbing systems, and manufactured all ducts and pipework at the Harris’ Zumbrota fabrication shop. This approach ...Read More
06.04.14

Hormel Foods Corporate Office North

Always mindful of the future, Hormel and the Harris design team chose to incorporate green building practices into the construction of the office 28,000-square foot addition that was awarded LEED Gold certification. Some of the sustainable aspects of the building included: Geothermal heating and cooling systems, utilizing vertical bore well loops Low-flow plumbing fixtures for water conservation Rainwater collection cistern All heating and cooling systems are controlled via ...Read More