03.22.18
Harris was selected by Layton Construction and Argent Group as the design-builder for the mechanical and plumbing work on the new Innovation Pointe development. This development consists of a 40-acre master plan with 600,000-square feet of development.
The current project is a five-story, 140,000-square foot office building with supporting parking structure. It was designed with the needs of today’s businesses in mind, with leading edge technology and high-end finishes.
With the modern progressive architecture ...
Read More
03.22.18
Harris was selected as the mechanical and plumbing design-build partner by Bonneville Builders and PEG Development for the new four-story hotel located in Provo, Utah.
This 84,000-square foot hotel consists of 132 minimalist-style rooms that include some of the new high-end Hyatt standards including new Moen type plumbing fixtures. Harris is excited to work with Beecher Walker and Associates on another hospitality design-build project.
Read More
03.22.18
The Hennepin County Medical Center (HCMC) Ambulatory Outpatient Specialty Center was initially designed to relocate over 20 different departments associated with HCMC into one building. As the design progressed, more square footage was added to accommodate additional departments. Increased project square footage as well as more densely used space truly pushed the limits of the design and the budget. To help smooth the process, Harris worked with the design and the construction team to track the budget from schematic design ...
Read More
05.16.17
Harris teamed with Kraus-Anderson Construction to build the new state-of-the-art, 84,000-square foot TRIA Orthopaedic Center in Woodbury, Minnesota. The facility offers orthopaedic and sports medicine services including a walk-in clinic, ambulatory surgery center and on-site rehabilitation services. Harris provided HVAC, plumbing and medical gas services for the facility, including operating rooms, MRI and therapy pool.
Manufacturing greatly increased Harris’ installation speed and efficiency. The team manufactured the center’s VAV boxes into racks and was able to ...
Read More
01.18.17
Harris provided and installed the mechanical equipment and condensate piping for the Phoenix Union Coding Academy. This new, 40,693-square foot school contains classrooms, maker’s lab, divided classroom with moveable walls, two labs and a full gym/cafeteria.
The project included several specialty features which Harris was able to install successfully. For the lab spaces, Harris installed stainless steel lab exhaust ductwork and performed the welding in-place. Some areas required grease ductwork. The gym and maker’s ...
Read More
01.13.17
Harris helped American Airlines renovate their office and data center to adjust to changing business needs. Construction took place in four phases to accommodate the occupants.
One phase of the project scope included removal of seven existing fluid cooler fan sections and replacing them with new fan sections. This work had to be scheduled with the owner so that at least two existing fluid coolers and a redundant cooler were always online. The owner’s data center ...
Read More
01.13.17
This project included the renovation of the existing East Valley Bus Operations Center. Scope of work included removing and replacing 34 existing under-floor air distribution terminal boxes located in the administration building. This work was completed in phases to accommodate staff working in the building during construction.
Scope also included overhead work to install four new supply air ducts and new controls for the under-floor terminal units. All units were tied in to existing BAS and test and ...
Read More
05.25.16
Twin Arrows Casino Resort is a five-story, 110-room, 71,630-square foot hotel addition with a 7,548-square foot spa. Harris performed installation of HVAC equipment including a 500-ton air cooled chiller and boiler, outside air and exhaust risers and a vertical and horizontal fan coil unit. Included among the plumbing installations were hot water and chilled water mechanical piping, domestic hot water re-circulation, pump, mixing valve, booster pump, water heaters and a hot water storage tank. Steel was used for mechanical ...
Read More
05.25.16
The Old Music Hall now houses mathematics, statistics, computer science offices and computer labs. However, the two top floors are still used as music practice rooms.
During this 14,000-square foot renovation, all old mechanical and plumbing systems were demolished and reinstalled. Additions included a DX unit and air conditioning unit for the computer lab.
Harris eliminated the need for fin tube radiation in several locations by installing air diffusers that were located near the windows ...
Read More
04.28.16
La Paz Regional Hospital’s new, 9,158 square foot surgical addition provides two surgical suites for major operations and two procedure suites for minor operations. The building was designed to create an open yet efficient work space, allowing patients to flow smoothly between areas while maximizing the number of people using the facility.
Harris Mechanical Southwest provided the complete plumbing and medical systems for the addition. The project required multiple shutdowns of the existing hospital’s facilities in ...