09.03.13
Harris worked extensively with stakeholders and St. Olaf College to design and install a new, sustainable science center. Much of the piping, duct systems and fixture assemblies for the 180,000-square foot building were prefabricated in Harris’ fabrication shop, allowing our company to comply with LEED certification requirements, complete work ahead of schedule and reduce time in the field.
To adhere to LEED certification requirements, Harris used low-VOC emitting adhesives and sealants for duct and pipe connections. A ...
Read More
09.03.13
Harris provided mechanical services for the Fairview Lakes Medical Center expansion and renovation. Harris installed four air handling units ranging in size from 12,000 to 20,000 cubic feet per minute. This installation and the associated tie-ins to existing HVAC systems were completed on off-hours to limit any disruption to patient services. Mechanical improvements also included the addition of a second emergency generator, as well as a new chiller and cooling towers.
In addition, Harris removed, replaced and rerouted many ...
Read More
09.03.13
Harris was contracted to provide design-assist mechanical services for this hospital expansion and remodeling project. The project included a new central plant containing boilers, chillers and generators, as well as an addition adding medical/surgical rooms and administration space. The addition was built with the capacity to add another four floors and additional space as necessary.
Several mechanical systems were manufactured by Harris off-site to streamline installations. As this is a healthcare facility, all the manufactured pieces ...
Read More
09.03.13
HealthSouth East Valley Rehabilitation Hospital is a new, 40-bed acute medical rehabilitation hospital totaling 47,500 square feet.
Harris provided complete plumbing and mechanical systems for the new hospital including medical gas piping, oxygen and vacuum systems. The project included the first installation of Trane’s water-cooled variable air volume (VAV) air handling systems; complete with an internal-cooling tower to provide maximum efficiency to the system. Harris also installed a complete medium and low-pressure ductwork distribution system including VAV ...
Read More
09.03.13
Thanks to the efforts of the project team during the original East Valley Rehabilitation Hospital build-out, Harris was invited back to perform the construction of the 20-bed addition. With the addition of new patient rooms, this new facility also required room for additional support staff including an expanded dining area and new nursing stations.
Harris performed all HVAC, plumbing and medical gas piping for the 11,060-square foot expansion. Tie-ins were made to the existing plumbing and medical ...
Read More
09.03.13
The Arizona Supreme Court building’s outdated chillers needed an upgrade. Harris was awarded the project to demolish and install a new central plant alongside MS Square Construction.
The new plant required a highly scheduled and implemented phasing plan to tie-in two temporary chillers to provide the cooling load for the facility during construction.
The scope of work involved demolition of all existing central plant equipment including the existing ice chillers, water chiller, pumps, piping, ...
Read More