06.27.14
Harris partnered with JW McClenahan and DPR Construction to design, coordinate and install complete HVAC systems for the new Lucile Packard Children’s Hospital (LPCH). Utilizing Lean Construction techniques and BIM/VDC technology, Harris fabricated and installed over 1.7 million pounds of ductwork, 19 air handlers and related HVAC equipment serving this 521,000-square foot state-of-the-art LEED Gold medical facility in the heart of the Silicon Valley.
Located on the Stanford University campus, the LPCH doubles in size with the ...
Read More
06.11.14
Harris completed the HVAC scope for the construction of the Terra Verde Corporate Campus. The new high-end office project located in the north corridor of Scottsdale, consists of four buildings.
For the first phase of the project, Harris provided complete HVAC systems that included installing two rooftop fluid coolers, three condenser water pumps, shell water source heat pump systems, as well as all piping, ductwork and direct current controls. To decreases energy consumption, two energy recovery ventilators ...
Read More
06.10.14
The 85,000-square foot Lookout Mountain Elementary School project was unique in that Harris, working for Adolfson & Peterson Construction, was responsible for the installation of the HVAC system involving the installation of a geothermal field and water source heat pumps. A portion of the design centered around a more traditional heating system but around 50 percent of the complex was served by this geo system.
Read More
06.10.14
Located adjacent to the existing Portland Medical Center, the Providence North Pavilion Medical and Cancer Center is an 11-story, 490,000-square foot building that houses physicians who specialize in major tumor types as well as internationally recognized researchers performing bench-to-bedside clinical trials. The facility also includes a learning center, a holistic health and counseling center, laundry facilities and a spa.
A state-of-the-art, 100 percent outside air system with high accuracy airflow terminal units provide constant pressure relationships, helping minimize ...
Read More
06.04.14
Always mindful of the future, Hormel and the Harris design team chose to incorporate green building practices into the construction of the office 28,000-square foot addition that was awarded LEED Gold certification.
Some of the sustainable aspects of the building included:
Geothermal heating and cooling systems, utilizing vertical bore well loops
Low-flow plumbing fixtures for water conservation
Rainwater collection cistern
All heating and cooling systems are controlled via ...
Read More
06.03.14
Harris was awarded the mechanical contract providing plumbing, piping, HVAC and BIM modeling and detailing services for the new Voxman Music Building on the University of Iowa (UI) campus. One of the most striking features of this five-story building is its large glass exterior designed to make the facility more open to the public and highlight its new location in the downtown area. It also features various noise reduction and environmental design elements and materials in the design and ...
Read More
09.03.13
Harris worked extensively with stakeholders and St. Olaf College to design and install a new, sustainable science center. Much of the piping, duct systems and fixture assemblies for the 180,000-square foot building were prefabricated in Harris’ fabrication shop, allowing our company to comply with LEED certification requirements, complete work ahead of schedule and reduce time in the field.
To adhere to LEED certification requirements, Harris used low-VOC emitting adhesives and sealants for duct and pipe connections. A ...
Read More
09.03.13
HealthSouth East Valley Rehabilitation Hospital is a new, 40-bed acute medical rehabilitation hospital totaling 47,500 square feet.
Harris provided complete plumbing and mechanical systems for the new hospital including medical gas piping, oxygen and vacuum systems. The project included the first installation of Trane’s water-cooled variable air volume (VAV) air handling systems; complete with an internal-cooling tower to provide maximum efficiency to the system. Harris also installed a complete medium and low-pressure ductwork distribution system including VAV ...
Read More
09.03.13
Thanks to the efforts of the project team during the original East Valley Rehabilitation Hospital build-out, Harris was invited back to perform the construction of the 20-bed addition. With the addition of new patient rooms, this new facility also required room for additional support staff including an expanded dining area and new nursing stations.
Harris performed all HVAC, plumbing and medical gas piping for the 11,060-square foot expansion. Tie-ins were made to the existing plumbing and medical ...
Read More
09.03.13
The Arizona Supreme Court building’s outdated chillers needed an upgrade. Harris was awarded the project to demolish and install a new central plant alongside MS Square Construction.
The new plant required a highly scheduled and implemented phasing plan to tie-in two temporary chillers to provide the cooling load for the facility during construction.
The scope of work involved demolition of all existing central plant equipment including the existing ice chillers, water chiller, pumps, piping, ...