10.11.22
Harris provided and installed over 24 miles of PEX piping below the new Minnesota United playing field. Heat exchangers, pumps and HDPE piping were installed in a dedicated mechanical room located on service level. This project evolved into a design-assist project. We worked closely with the PEX supplier, Rehau, to design the size and routing of the underground piping.
Our CAD department created a working model that allowed us to pre-fabricate all of the ...
Read More
10.10.22
Harris was the general contractor responsible for the systems improvements at the Metro Wastewater Treatment Plant in St. Paul, Minnesota. The sewage and waste disposal project required the replacement of several large pieces of equipment which included the primary heat exchangers, boiler economizers and evaporators and ID fan motors. Harris also installed new overfire air systems and a hot media extraction system.
The original design for the HMES system did not account for ...
Read More
10.10.22
Harris worked with Standby Systems Inc to fabricate 13 skids for a General Electric propane vapor system to be installed in the country of Ghana, Africa. The skids, which were shipped internationally, contained piping, pumps, valves, heat exchangers, structural frames and supports for the metering and vaporization of the propane.
Framing and piping for the skids were constructed from 304 stainless steel, which quality specifications were required to meet the pressure equipment directive (PED) of ...
Read More
10.06.22
Harris has had a long and successful history of working on the St. Olaf College campus. Our design team worked with the College and the other design partners to provide the best options and meet St. Olaf’s long-standing commitment to match or exceed the quality and aesthetics of their existing buildings.
Harris was committed to a strong buy-out process, performing a second and third buy-out comparison after design completion to ensure the ...
Read More
10.05.22
Harris was hired on the Arizona State University Health Solutions Innovation Center to perform the installation of mechanical piping, HVAC and process piping systems. The new 150,000-square-foot, three-story, ground-up facility will serve students in ASU’s nursing program as they learn to treat patients using a whole health model encompassing mind, body and spirit. The facility features specific clinical skills labs with simulation exam and operating rooms. It includes space for a future MRI build-out, dry and ...
Read More
10.04.22
Harris remodeled the HVAC and plumbing systems in a 101,000 square-foot warehouse. The space was originally a retail location and was made into a family fun/amusement center. We started underslab and cut in new plumbing for six new restrooms. The existing RTUs were retrofitted with new duct work to accommodate the new spaces. The new spaces included a laser tag area, mini golf, bowling alley and party rooms.
Several issues were resolved by our team. These included ...
Read More
10.03.22
Harris is once again involved in constructing the latest iconic location on the Las Vegas Strip. Once completed in 2023, MSG Sphere will be a state-of-the-art 20,000 seat concert and special event venue that will provide an amazing once-in-a-lifetime visual and auditory experience. The MSG Sphere will have 170,000 sq. ft. of interior ultra HD LED screens and all sound will be delivered by “beamforming” technology, instead of overhead hanging speakers, allowing all attendees to experience any event the exact same way ...
Read More
10.03.22
This project for the US Army Corp of Engineers consisted of design and construction of an existing barracks building. The building was converted into administrative space for a designated end user. The design and construction included demolition of all existing engineering systems. Demolition of the existing architectural systems included the roof, exterior doors, and windows. This project also included design and construction of completely new engineering systems to include site work, HVAC, plumbing, fire protection, electrical, communication, and structural ...
Read More
08.11.20
Harris was awarded the mechanical and plumbing scopes for the Level 4 and 5 WeWork office space at the Gateway 6 in Salt Lake City, Utah. The project was a retrofit in an existing office space, which required demo of existing systems and installation of new VAV’s, ductwork and piping. WeWork utilizes a number of open office areas with exposed ceilings, which made the quality of MEP installation a key component of the overall look and feel of the space. As ...
Read More
08.11.20
Harris’ scope included plumbing, mechanical piping, process piping and ductwork. This was a highly collaborative design-assist project. The facility is approximately 5.3 million square feet of operational production and advanced manufacturing space across multiple floors and several acres.
Harris delivered solutions on several challenges throughout the project. The local union hall was not adequately staffed for a project this size. Harris met with the top leaders of the International Unions to discuss nationwide workforce availability and develop recruiting ...