For over 30 years, Harris has been the HVAC contractor of choice for Verizon Communications, a large communications and data provider based out of Basking Ridge, NJ. We received our master subcontractor agreement with Verizon in 1990. In preparation for the rollout of the nationwide 5G wireless network, Verizon has made tremendous investments to update their existing data centers to facilitate the new servers needed to implement this new technology. They own over 600 switching sites and data centers in the DMV ...
Read More
10.03.22
Harris has been serving one of the world’s largest cloud storage providers for several years and has become a trusted partner for their critical data center campuses in northern Virginia and Ohio. All projects for this owner are evaporative cooling designs and are on average 250,000 square feet each. The projects utilize industrial water evaporative coolers and hot aisle containment to cool the equipment. Power rooms are also cooled using evaporative CRAH units and exhaust fans. Battery rooms and ...
Read More
10.03.22
Harris was selected as the mechanical contractor for this renovation of the Benioff Oakland Children’s Hospital, largely based on our long and successful history of hospital construction in the Bay Area, as well as our ability to execute the plumbing, mechanical piping and HVAC dry components under a single contract. This 28,000-square-foot 2-story remodel and upgrade consists of a new 23 bed PICU unit supported by an on suite Pharmacy, Pharmacy Hood, PBX/Sta lab and morgue.
Read More
10.03.22
Stanford Clinical Lab was comprised of four initial phases. The initial phase consisted of a rehabilitation work in preparation for the more robust rehabilitation in phases 2 and 4. These larger phases involved craning in a temporary air handling unit which would provide airflow into adjacent spaces while we stripped down and completely rebuilt the Clinical Lab space. The phase 2 workspace was also located directly below active operation rooms that would not allow for noise and vibration to occur ...
Read More
10.03.22
Harris teamed up with Hensel Phelps for the plumbing a mechanical scope of the AME Polymers Lab (core and shell) and the AME Office building on the 2200 block of the laboratory. These two buildings were part of the first Applied Materials Engineering (AME) area plan put together by LLNL and NNSA to support stockpile stewardship.
Polymers lab consisted of a 13,000-square-foot, single story building with a complete mechanical and plumbing system with integrated ...
Read More
09.30.22
Harris was hired as the mechanical contractor to renovate an historic building located in downtown Vallejo for the La Clinica project. The exterior of the building was preserved while the interior was demolished. The facility serves as a dental clinic for the community.
Harris’ scope was plumbing only on this project which included the domestic waters, sanitary, storm drainage (including subsurface drainage within the building) and medical gases. At the dental chairs, our ...
Read More
09.30.22
The Bay Area Transit Hayward Station project was a service facility warehouse for BART and is located right next to the rail in Hayward, California. The project was a 135,000-square-foot building that included mostly warehouse space with some offices. The warehouse included under floor radiant piping to provide a comfort level for the client. Harris provided all of the plumbing, HVAC and ductwork on this project. The project was new construction which included plumbing underground all the ...
Read More
09.30.22
The Atherton Town Center project is comprised of a new city hall, library, police ancillary and remodel of the old existing town hall. Harris provided complete mechanical and plumbing systems, including controls and balancing on all structures. The main buildings are tied together through a 17K+ lb. mechanical heat pump system with a 118-ton heating/cooling capacity and interlocking BAS controls.
The new City Hall building includes 3 air handing units, 4 mechanical pumps, VRF ...
Read More
09.30.22
The Whidbey General Hospital Addition and Renovation project consisted of full mechanical scope for an addition and renovation to the existing facility. The addition consisted of 45 bed patient rooms, ICU rooms and labor and delivery rooms. The renovation included build out of pharmacy, lab and perioperative spaces. The HVAC systems included new penthouse air handlers feeding an VRF system.
The hospital’s domestic water supply source was an encased well and the water quality was poor. A ...
Read More
09.30.22
The Building 101 Mental Health and Research Building project scope included all plumbing, medical gases and mechanical work associated with the 203,000 square-foot new building. Harris also installed a central plant upgrade and new utilities in an existing tunnel, all while not impacting the main hospital.
The new multi-story building incorporates 68,000 square feet of space for mental health services with 111,000 square feet dedicated to research and 20,000 square feet for administrative support. The VA Mental Hospital is built with the ...