01.13.17

American Airlines Office and Data Center Renovation

Harris helped American Airlines renovate their office and data center to adjust to changing business needs. Construction took place in four phases to accommodate the occupants. One phase of the project scope included removal of seven existing fluid cooler fan sections and replacing them with new fan sections. This work had to be scheduled with the owner so that at least two existing fluid coolers and a redundant cooler were always online. The owner’s data center ...Read More
01.13.17

East Valley Bus Operations Center

This project included the renovation of the existing East Valley Bus Operations Center. Scope of work included removing and replacing 34 existing under-floor air distribution terminal boxes located in the administration building. This work was completed in phases to accommodate staff working in the building during construction. Scope also included overhead work to install four new supply air ducts and new controls for the under-floor terminal units. All units were tied in to existing BAS and test and ...Read More
10.31.16

UNLV Science and Engineering Building

The Science and Engineering Building (SEB) is a state-of-the-art facility located on the campus of the University of Nevada-Las Vegas (UNLV). When the building was first designed, UNLV wanted a research facility that was not only innovative, but energy efficient and they turned to Harris to make that a reality. The systems that Harris installed use 32 percent less energy and 42 percent less water than laboratory buildings of the same size. The SEB project was awarded a LEED Silver rating, ...Read More
06.10.16

U of U Marriott Library Phases I, II, III (2015-2018)

Harris worked to improve the quality of the University of Utah Marriott Library’s occupant comfort by providing a retrofit of variable air volume (VAV) air handling systems and controls including piping modifications to relocate water pipes from above the Rare Books Vault. To avoid disrupting students and faculty, Harris made special arrangements to work during fall break when the library had fewer users. Sections of the library were isolated to keep the occupants safe and reduce disturbances. Read More
06.10.16

U of U S.J. Quinney College of Law

Harris was awarded a contract to provide HVAC controls on new construction for the prestigious S.J. Quinney College of Law Building at the University of Utah. As part of its services, Harris installed new controls including six-way control valves on chilled beams, heating/cooling water controls and air handling units. The controls included a 375,000-gallon thermal storage tank, that allows the use of chillers during off peak hours. This project had strict deadlines and ...Read More
05.25.16

Twin Arrows Casino Resort Expansion

Twin Arrows Casino Resort is a five-story, 110-room, 71,630-square foot hotel addition with a 7,548-square foot spa. Harris performed installation of HVAC equipment including a 500-ton air cooled chiller and boiler, outside air and exhaust risers and a vertical and horizontal fan coil unit. Included among the plumbing installations were hot water and chilled water mechanical piping, domestic hot water re-circulation, pump, mixing valve, booster pump, water heaters and a hot water storage tank. Steel was used for mechanical ...Read More
04.29.16

MCES Sludge Incinerator

Harris teamed with Von Roll Inc to provide sludge incineration at the largest of the eight sewage plants in the Metropolitan Council of Environmental Services (MCES) system. Von Roll Inc designed the incineration process. Harris helped procure the project, provided mechanical systems design and directed the construction coordination with other contractors. The MCES project included the design, procurement and installation of three fluidized bed incinerator trains. Each train included the fluidized bed incinerator, primary and secondary heat ...Read More
04.28.16

La Paz Regional Hospital

La Paz Regional Hospital’s new, 9,158 square foot surgical addition provides two surgical suites for major operations and two procedure suites for minor operations. The building was designed to create an open yet efficient work space, allowing patients to flow smoothly between areas while maximizing the number of people using the facility. Harris Mechanical Southwest provided the complete plumbing and medical systems for the addition. The project required multiple shutdowns of the existing hospital’s facilities in ...Read More
04.28.16

IKEA

IKEA is a 200,000-square foot stand-alone retail space located at the Mall of America. Harris was hired by Pepper Construction’s Retail Group to provide the plumbing and HVAC for the new IKEA store. In addition to large showroom spaces designed for high visibility and flexibility, the IKEA store feature amenities not normally found in big box retail – restaurant, lounge, escalators, etc. Functional spaces included office, self-serve department, as-is department and various showrooms. Large rooftop units fed ...Read More
04.28.16

Central Arizona Project (CAP) Chiller Project

Harris, in coordination with the Central Arizona Project (CAP), replaced the existing water-cooled chillers with air-cooled chillers at the Brady, Picacho and Red Rock Pumping Plants on the CAP Aqueduct. Harris operated in a prime contracting role and self-performed the mechanical scope. This project included the removal of the existing chillers, installation of new chillers, replacement of piping and specialties, and HVAC renovations. Subcontracts were let for electrical power wiring to serve the new equipment, temperature controls, ...Read More