Citing their obsolete boilers and growing demand for electricity and power, the University of Minnesota turned to Harris for help with the installation of a state-of-the-art combined heat and power plant for their Minneapolis campus.
Due to zoning and permitting constraints, the new turbine generator, heat recovery system and modern mechanical systems had to fit in the historic Old Main Heating Plant. To head off space issues and potential clashes, Harris and its ...
Read More
10.12.22
For the River Towers HVAC Revitalization and Remediation project, Harris was the general contractor with multiple subcontractors direct with the owner. The project was design-build with mechanical, electrical, structural and architectural scope of work. The project consisted of condos with (2) towers, one 30 stories and the other 18 stories. There were also boilers, snowmelt, pool heating, plumbing heating and a 200-foot lattice flue structure up through the center of the building. This was an HVAC retrofit project that also ...
Read More
10.12.22
The Ridgeview Medical Center Surgery Remodel project was awarded to Harris as a design-build project. Harris provided the ductwork, design and engineering, HVAC, medical gas piping plumbing and test and balance for the project. We added new radiant panels above the patient beds along with a new headwall layout. The remodel was approximately 6,000 square feet and consisted of 23 beds.
This project was completed in ...
Read More
10.11.22
Once Harris completed construction of the new Park Nicollet clinic and ramp, it was time to get started on remodeling the existing clinic. The existing clinic is roughly 80,000 square feet and is to remain open during construction.
Knutson Construction worked with the owner and put together a multi-phased schedule. Each phase would cover a certain area of the clinic while the surrounding areas remained open to patients. Multiple phases on a building of ...
Read More
10.11.22
The Park Nicollet Specialty Center and Parking Ramp project is a new 86,000 square-foot clinic in Burnsville, Minnesota. The project consisted of building both a new three-story clinic and specialty care center, as well as a three-level parking garage. The clinic will include a same-day surgery center, urgent care center and medical and surgical specialty care.
Harris provided the ductwork, design and engineering, HVAC, mechanical piping, medical gas piping, plumbing and preconstruction services. A ...
Read More
10.11.22
The Minneapolis Bus Garage Project consists of a 350,000-square-foot bus garage to support a fleet of new buses for the City of Minneapolis. This includes a 3-bay fueling station, 2 bus washing bays, 24 maintenance bays, parking for 220 busses, underground employee parking and 3 floors of office space.
During preconstruction, Harris worked with the EOR to value engineer the mechanical system to substitute single package simultaneous water to water heat pumps to provide the building’s ...
Read More
10.11.22
Harris provided and installed over 24 miles of PEX piping below the new Minnesota United playing field. Heat exchangers, pumps and HDPE piping were installed in a dedicated mechanical room located on service level. This project evolved into a design-assist project. We worked closely with the PEX supplier, Rehau, to design the size and routing of the underground piping.
Our CAD department created a working model that allowed us to pre-fabricate all of the ...
Read More
10.10.22
Harris has been selected by M.A. Mortenson as the mechanical partner for the new Minnesota United FC Stadium in the Midway area of St. Paul. The $250 million, 346,000-square foot, 19,600-seat stadium will be home to Major League Soccer (MLS) in Minnesota.
The Harris team was engaged early to help with conceptional budgeting and design influences. Our team is currently working alongside the owner, architect and engineer in a design-assist role. An initial ...
Read More
10.10.22
Harris was the general contractor responsible for the systems improvements at the Metro Wastewater Treatment Plant in St. Paul, Minnesota. The sewage and waste disposal project required the replacement of several large pieces of equipment which included the primary heat exchangers, boiler economizers and evaporators and ID fan motors. Harris also installed new overfire air systems and a hot media extraction system.
The original design for the HMES system did not account for ...
Read More
10.10.22
Harris was awarded the mechanical contract for the expansion and renovation of the existing science lab building, The Nobel Hall houses the departments of biology, chemistry, geography, and geology. The 74,000 square-foot south expansion included new laboratories, teaching and study spaces, and connected Nobel Hall with Schaefer Fine Arts Center, creating a laboratory theatre. The project is certified LEED gold and has already helped contribute to over $186,000 in energy rebates for Gustavus.
Harris completed ...