10.03.22
Harris is once again involved in constructing the latest iconic location on the Las Vegas Strip. Once completed in 2023, MSG Sphere will be a state-of-the-art 20,000 seat concert and special event venue that will provide an amazing once-in-a-lifetime visual and auditory experience. The MSG Sphere will have 170,000 sq. ft. of interior ultra HD LED screens and all sound will be delivered by “beamforming” technology, instead of overhead hanging speakers, allowing all attendees to experience any event the exact same way ...
Read More
10.03.22
For over 30 years, Harris has been the HVAC contractor of choice for Verizon Communications, a large communications and data provider based out of Basking Ridge, NJ. We received our master subcontractor agreement with Verizon in 1990. In preparation for the rollout of the nationwide 5G wireless network, Verizon has made tremendous investments to update their existing data centers to facilitate the new servers needed to implement this new technology. They own over 600 switching sites and data centers in the DMV ...
Read More
10.03.22
The Pepco Waterfront Substation project was a new substation installation for the Potomac Electric Power Company of Washington, D.C. It was a design-assist job with Coakley Williams Construction and their mechanical engineer, META Engineers. The building had to be designed to house and accommodate a new ABB turbine technology that Pepco was using to make power with a smaller footprint than their traditional power plants. The site in Southeast Washington, D.C. was selected because of its proximity ...
Read More
10.03.22
Harris has been serving one of the world’s largest cloud storage providers for several years and has become a trusted partner for their critical data center campuses in northern Virginia and Ohio. All projects for this owner are evaporative cooling designs and are on average 250,000 square feet each. The projects utilize industrial water evaporative coolers and hot aisle containment to cool the equipment. Power rooms are also cooled using evaporative CRAH units and exhaust fans. Battery rooms and ...
Read More
10.03.22
Harris Bay Area has teamed up with Harris Design Studio on a design-build project for San Francisco State University. The new science building project includes 126,000 GSF building which will provide students with classrooms, learning labs, research labs, etc. This target value design project will include integrated project delivery process, tools, and behaviors and is expected to achieve LEED Gold. Harris was given the schematic design documents and is currently working on the design documents and will be ...
Read More
09.30.22
The Whatcom Community College Student House Phase 1 is an 89,000-square-foot, 221 bed dormitory facility. Additionally, it includes administration offices, public rest rooms, laundry, a mechanical equipment room, kitchen and community rooms. The structure is wood framing with electric cove heat in the dormitories, VRF in the offices and packaged DX units for the community rooms.
Harris contributed by developing an early schematic design budget that yielded excellent value for the owner. We were able design to this budget ...
Read More
09.30.22
Harris was awarded the design-assist contract for the new Sehome High School in Bellingham, Washington. This state-of-the-art facility fosters innovation and provides flexibility for future programmatic initiatives. New athletic fields, baseball, softball & football. The design focused on creating a healthy learning/teaching environment while being energy efficient and enhancing student safety.
Harris provided value engineering at the beginning of the project that saved the owner money while not sacrificing on quality. Some examples of value engineering ...
Read More
09.30.22
Lake Stevens High School was a multi-phased modernization of the existing facility on a 35.6-acre site. The project was a mix of additions, modernization and replacements. The school remained occupied and operational throughout all phases of construction and was surrounded by single-family residential neighborhoods. The student population is 1,800 consisting of grades 10-12. Design involved new or renovated general classrooms, art classrooms, science, technology, engineering, music, special education, athletics, performing arts, two gymnasiums, an existing pool, cafeteria/commons, library and ...
Read More
09.30.22
The Issaquah Middle School project is a progressive design-build project. Harris’ design partner for the project was Hargis. Harris performed the complete plumbing, including domestic, DWV, acid waste, hot water plant and fixture trim. We also performed the complete HVAC, including the boiler, water to water HP, chiller and all air handling equipment. Harris’ subcontractors included HVAC controls, insulation and test and balance.
A challenge on the project was the site had a 120′ elevation change causing the ...
Read More
09.30.22
The Building 101 Mental Health and Research Building project scope included all plumbing, medical gases and mechanical work associated with the 203,000 square-foot new building. Harris also installed a central plant upgrade and new utilities in an existing tunnel, all while not impacting the main hospital.
The new multi-story building incorporates 68,000 square feet of space for mental health services with 111,000 square feet dedicated to research and 20,000 square feet for administrative support. The VA Mental Hospital is built with the ...
Read More