10.12.20
DataBank’s Granite Point SLC2 data center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the facility offers network connectivity to multiple Tier 1 and Tier 2 providers. The facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment.
Harris installed 11 owner provided CRAH units in SLC2. The Data Hall was to remain operational throughout the duration of the project, ...
Read More
08.11.20
Harris’ scope included plumbing, mechanical piping, process piping and ductwork. This was a highly collaborative design-assist project. The facility is approximately 5.3 million square feet of operational production and advanced manufacturing space across multiple floors and several acres.
Harris delivered solutions on several challenges throughout the project. The local union hall was not adequately staffed for a project this size. Harris met with the top leaders of the International Unions to discuss nationwide workforce availability and develop recruiting ...
Read More
08.11.20
The Phoenix International Raceway project was a combination of three phases; a renovation of the existing grandstands, new grandstands and 13 new buildings located in the infield of the track. Each phase included plumbing, sheetmetal ductwork for the suites, track operations, concessions, kitchens and toilet facilities. The project was scheduled in phases over two years with milestone dates that had to be met before the race events in April and November.
Race day could not be impacted by ...
Read More
03.23.18
In June 2013, Harris was selected to provide the demolition and replacement of all existing plumbing, HVAC piping and sheet metal and temperature control systems for the restoration of the more than 100-year-old historic Minnesota State Capitol building.
After 100+ years of service, the Capitol building had reached a critical deterioration point with a crumbling exterior, antiquated mechanical and electrical infrastructure, and inadequate life safety systems.
The project team worked hard to overcome the challenges associated with ...
Read More
03.22.18
The David Eccles School of Business at the University of Utah offers students over two dozen courses for students pursuing their undergraduate and master degrees. Nestled in the heart of the “Silicone Slopes”, the University serves approximately 4,500 students annually. The Garff Executive Education building will house the University’s graduate program.
Jacobsen Construction Co selected Harris to be the mechanical and plumbing contractor for the new 150,000-square foot classroom and executive training facility.
The mechanical ...
Read More
03.22.18
Harris was selected by Big-D Construction as the mechanical and plumbing subcontractor for the new Salt Lake Community College (SLCC) Westpointe Career and Technical Education Center. Located in Salt Lake City, this two-story, 121,000-square foot building is a new, state-of-the-art education facility that houses skills labs, classrooms, faculty offices and administrative support.
This facility will include all the training equipment and tools to help advance individuals in their careers in Advanced Composites, Diesel Systems Technology, Machining, Manufacturing, ...
Read More
03.22.18
Harris was selected by Layton Construction and Argent Group as the design-builder for the mechanical and plumbing work on the new Innovation Pointe development. This development consists of a 40-acre master plan with 600,000-square feet of development.
The current project is a five-story, 140,000-square foot office building with supporting parking structure. It was designed with the needs of today’s businesses in mind, with leading edge technology and high-end finishes.
With the modern progressive architecture ...
Read More
03.22.18
Harris was selected as the mechanical and plumbing design-build partner by Bonneville Builders and PEG Development for the new four-story hotel located in Provo, Utah.
This 84,000-square foot hotel consists of 132 minimalist-style rooms that include some of the new high-end Hyatt standards including new Moen type plumbing fixtures. Harris is excited to work with Beecher Walker and Associates on another hospitality design-build project.
Read More
05.16.17
Harris teamed with Kraus-Anderson Construction to build the new state-of-the-art, 84,000-square foot TRIA Orthopaedic Center in Woodbury, Minnesota. The facility offers orthopaedic and sports medicine services including a walk-in clinic, ambulatory surgery center and on-site rehabilitation services. Harris provided HVAC, plumbing and medical gas services for the facility, including operating rooms, MRI and therapy pool.
Manufacturing greatly increased Harris’ installation speed and efficiency. The team manufactured the center’s VAV boxes into racks and was able to ...
Read More
01.24.17
Harris worked as the prime contractor for Xcel Energy’s 5th Street Substation Transformer Cooling System Replacement project. The project involved demolishing the existing cooling system and installing an efficient, closed-loop system to service the new transformer.
Prior to the closed-loop system Harris installed, Xcel was drawing their cooling water from two deep wells. Xcel decided this system was not a sustainable use of groundwater and made plans to replace it.
Harris took special safety ...
Read More