05.16.17
Harris teamed with Kraus-Anderson Construction to build the new state-of-the-art, 84,000-square foot TRIA Orthopaedic Center in Woodbury, Minnesota. The facility offers orthopaedic and sports medicine services including a walk-in clinic, ambulatory surgery center and on-site rehabilitation services. Harris provided HVAC, plumbing and medical gas services for the facility, including operating rooms, MRI and therapy pool.
Manufacturing greatly increased Harris’ installation speed and efficiency. The team manufactured the center’s VAV boxes into racks and was able to ...
Read More
01.24.17
Harris worked as the prime contractor for Xcel Energy’s 5th Street Substation Transformer Cooling System Replacement project. The project involved demolishing the existing cooling system and installing an efficient, closed-loop system to service the new transformer.
Prior to the closed-loop system Harris installed, Xcel was drawing their cooling water from two deep wells. Xcel decided this system was not a sustainable use of groundwater and made plans to replace it.
Harris took special safety ...
Read More
01.13.17
The Cannon Falls High School Ventilation Improvement project had a very aggressive schedule. Nearly all the work needed to be completed during the summer months while school was not in session. At the peak, we had 40 people working on-site, in addition to those fabricating in the shop. At a time when the labor market was very tight, we were able to leverage resources from Harris’ Rochester, Zumbrota and St. Paul offices to complete the project without delay.
...
Read More
05.26.16
The University of Minnesota’s Amundson Hall Lab Addition is a 42,000-square foot chemistry lab addition known as the Gore Annex. Remodel involved complete plumbing, HVAC, controls and fire protection services.
Sandwiched between buildings, the remodel of the 65-year-old building took place in occupied lab spaces with frequent student traffic. Lab air balancing was affected by existing building systems which required additional project team work to resolve.
Harris provided a substantial amount of value engineering ...
Read More
05.25.16
Tomson Hall was built over the top of the old science building after Regents Hall, a new science building, was constructed. The existing building was almost demolished, leaving only the foundation and columns.
Harris worked with The Boldt Company and Muska Electric to complete this design-build project on-time and under the original budget. Harris designed and installed a complete mechanical system, including plumbing, heating and cooling for this four-story building.
Six air handling units provide ...
Read More
04.29.16
Harris has a long-standing relationship with the Minneapolis Institute of Art and has provided mechanical systems and maintenance work for many years. When the museum planned to build a new addition, Harris joined JE Dunn Construction to perform mechanical services for the project.
Harris’ knowledge of existing systems provided a value-add for the customer. The team was able to come in early in the planning process and devise a custom mechanical system that efficiently met the museum’...
Read More
04.25.16
The Central Laboratory project consolidated the services provided by over 50 laboratories into one core lab located on the Abbott Northwestern campus in Minneapolis. Built on the second floor of an Allina warehouse, the total construction area covers approximately 76,000 square feet. The Central Laboratory Facility serves 11 Allina hospitals, 49 Allina medical clinics, 13 Aspen clinics, five Quello clinics and several specialty care services. More than 400 people working in Abbott Northwestern campus labs moved into the new lab which is one of the ...
Read More
04.07.16
Harris and St. Olaf College enjoy a long-term relationship as Harris has worked with the college for years to successfully complete numerous new construction and renovation projects.
The Kildahl Hall project consisted of a three-story bathroom addition on one end of an existing dormitory building and a complete gut and remodel of the building’s HVAC, piping and plumbing systems.
The remodel portion of the project took place in two phases each having to be ...
Read More
12.18.15
Harris provided both plumbing and HVAC services for the Park Nicollet Women’s Center at Methodist Hospital located in St. Louis Park, Minnesota. The design-build project included a 30,000-square foot build-out on the fifth floor of the existing hospital. Work included the installation of a new 35,000 cubic feet per minute custom air handling unit installed in the penthouse above.
Harris took several steps to ensure construction did not disrupt the hospital’s day-to-day operations. Plumbing work on ...
Read More
09.25.15
Harris construction and controls teams collaborated on this state-of-the-art inpatient pharmacy conveniently located on the first floor of the hospital. The pharmacy relocation project was a complete design-build effort aiming to transform an existing hospital space into a new inpatient pharmacy that satisfied the needs of the Minneapolis Children’s Hospital.
The goal of the design and subsequent construction was to provide the hospital with a fail-safe, stand-alone mechanical system for three new clean rooms. To make ...
Read More