10.12.22
For the River Towers HVAC Revitalization and Remediation project, Harris was the general contractor with multiple subcontractors direct with the owner. The project was design-build with mechanical, electrical, structural and architectural scope of work. The project consisted of condos with (2) towers, one 30 stories and the other 18 stories. There were also boilers, snowmelt, pool heating, plumbing heating and a 200-foot lattice flue structure up through the center of the building. This was an HVAC retrofit project that also ...
Read More
10.12.22
The Ridgeview Medical Center Surgery Remodel project was awarded to Harris as a design-build project. Harris provided the ductwork, design and engineering, HVAC, medical gas piping plumbing and test and balance for the project. We added new radiant panels above the patient beds along with a new headwall layout. The remodel was approximately 6,000 square feet and consisted of 23 beds.
This project was completed in ...
Read More
10.10.22
Harris has been selected by M.A. Mortenson as the mechanical partner for the new Minnesota United FC Stadium in the Midway area of St. Paul. The $250 million, 346,000-square foot, 19,600-seat stadium will be home to Major League Soccer (MLS) in Minnesota.
The Harris team was engaged early to help with conceptional budgeting and design influences. Our team is currently working alongside the owner, architect and engineer in a design-assist role. An initial ...
Read More
10.10.22
ABLMS is a mechanical infrastructure improvement project at the University of Minnesota – Twin Cities. The building has four levels of labs and faculty offices along with a modern meat processing facility. Harris was contracted to upgrade the current constant air handling systems (located in the lower level) with higher efficiency variable air volume (VAV) systems, consolidate lab exhaust, install energy recovery coils, and replace aging ductwork and piping systems. The project is phased ...
Read More
10.06.22
This project consisted of remodeling the old field house on the St. Olaf College campus into a new hockey arena. The ice arena is located inside Skoglund Fieldhouse. The updated design includes an NHL-size rink, seating for 800 fans, locker rooms for varsity hockey, and other ice-related program spaces.
Locating the rink inside Skoglund allowed for the campus to reuse an existing building envelope that already had the required utility infrastructure. The project also ...
Read More
10.06.22
Harris completed the renovation for the St. Olaf College Holland Hall. Holland Hall opened in 1925 and had its interior renovated in 1969. The 1969 renovation allowed for more space and usage, however, much of the Holland Hall’s original character was lost. This renovation of Holland Hall rebuilt and restored its original design, combining classic architecture and adaptable classrooms filled with modern teaching technologies. The updated Holland Hall houses the Economics, History, Philosophy, Political Science, Social Work and Family Studies, and ...
Read More
10.03.22
Stanford Clinical Lab was comprised of four initial phases. The initial phase consisted of a rehabilitation work in preparation for the more robust rehabilitation in phases 2 and 4. These larger phases involved craning in a temporary air handling unit which would provide airflow into adjacent spaces while we stripped down and completely rebuilt the Clinical Lab space. The phase 2 workspace was also located directly below active operation rooms that would not allow for noise and vibration to occur ...
Read More
10.12.20
DC2 is a build-out of a Tier IV mission critical data center. The original facility was constructed in 2006, with enough space for future buildouts as the client’s expansion needs dictated. This data floor expansion began in January 2011, with a fully commissioned completion date of June 2011.
Harris worked with one of the largest data center builders in North America to provide total mechanical construction needs for a confidential client; with the general contractor providing the major pieces ...
Read More
08.11.20
Harris recently completed the Marshfield Clinic Health System’s 200,000-square foot hospital and a 40,000-square foot cancer center expansion. The project includes a new central heating and cooling plant. The clinic’s mechanical systems are currently connected by underground tunnels with the hospital feeding the cancer center from a central chilled water, hot water and medical gas system.
This fast track project was split into two phases with phase one, the cancer center having less than a ...
Read More
08.11.20
The Banner del Web project was a change of the lower floor of the building from a fully exhausted constant volume system to a variable air-volume system with return air. Harris was selected as the prime contractor based on qualifications and approach to execute the project. The project required modifying the existing 168,000 cfm AHU-24 and the replacement of the existing return air handling units. The (2) 200 hp. 84,000 cfm fans were removed from an in-phased plan so one fan could remain ...
Read More