The Ridgeview Medical Center Surgery Remodel project was awarded to Harris as a design-build project. Harris provided the ductwork, design and engineering, HVAC, medical gas piping plumbing and test and balance for the project. We added new radiant panels above the patient beds along with a new headwall layout. The remodel was approximately 6,000 square feet and consisted of 23 beds.
This project was completed in ...
Read More
10.11.22
Once Harris completed construction of the new Park Nicollet clinic and ramp, it was time to get started on remodeling the existing clinic. The existing clinic is roughly 80,000 square feet and is to remain open during construction.
Knutson Construction worked with the owner and put together a multi-phased schedule. Each phase would cover a certain area of the clinic while the surrounding areas remained open to patients. Multiple phases on a building of ...
Read More
10.11.22
The Park Nicollet Specialty Center and Parking Ramp project is a new 86,000 square-foot clinic in Burnsville, Minnesota. The project consisted of building both a new three-story clinic and specialty care center, as well as a three-level parking garage. The clinic will include a same-day surgery center, urgent care center and medical and surgical specialty care.
Harris provided the ductwork, design and engineering, HVAC, mechanical piping, medical gas piping, plumbing and preconstruction services. A ...
Read More
10.10.22
Harris was hired by JE Dunn Construction for a complete mechanical and plumbing upgrade for the 48,000-square foot emergency department remodel project at Abbott Northwestern Hospital. This project included a new heating water system and upgraded built-in-place custom air handling unit. The existing dual duct was changed out to a new VAV system with return valves and pressure monitoring and control. An upgraded control system and graphics package was also included for the remodeled emergency department and ...
Read More
10.03.22
Stanford Clinical Lab was comprised of four initial phases. The initial phase consisted of a rehabilitation work in preparation for the more robust rehabilitation in phases 2 and 4. These larger phases involved craning in a temporary air handling unit which would provide airflow into adjacent spaces while we stripped down and completely rebuilt the Clinical Lab space. The phase 2 workspace was also located directly below active operation rooms that would not allow for noise and vibration to occur ...
Read More
09.30.22
Harris was hired as the mechanical contractor to renovate an historic building located in downtown Vallejo for the La Clinica project. The exterior of the building was preserved while the interior was demolished. The facility serves as a dental clinic for the community.
Harris’ scope was plumbing only on this project which included the domestic waters, sanitary, storm drainage (including subsurface drainage within the building) and medical gases. At the dental chairs, our ...
Read More
09.30.22
The Building 101 Mental Health and Research Building project scope included all plumbing, medical gases and mechanical work associated with the 203,000 square-foot new building. Harris also installed a central plant upgrade and new utilities in an existing tunnel, all while not impacting the main hospital.
The new multi-story building incorporates 68,000 square feet of space for mental health services with 111,000 square feet dedicated to research and 20,000 square feet for administrative support. The VA Mental Hospital is built with the ...
Read More
08.11.20
Harris recently completed the Marshfield Clinic Health System’s 200,000-square foot hospital and a 40,000-square foot cancer center expansion. The project includes a new central heating and cooling plant. The clinic’s mechanical systems are currently connected by underground tunnels with the hospital feeding the cancer center from a central chilled water, hot water and medical gas system.
This fast track project was split into two phases with phase one, the cancer center having less than a ...
Read More
03.22.18
The Hennepin County Medical Center (HCMC) Ambulatory Outpatient Specialty Center was initially designed to relocate over 20 different departments associated with HCMC into one building. As the design progressed, more square footage was added to accommodate additional departments. Increased project square footage as well as more densely used space truly pushed the limits of the design and the budget. To help smooth the process, Harris worked with the design and the construction team to track the budget from schematic design ...
Read More
05.16.17
Harris teamed with Kraus-Anderson Construction to build the new state-of-the-art, 84,000-square foot TRIA Orthopaedic Center in Woodbury, Minnesota. The facility offers orthopaedic and sports medicine services including a walk-in clinic, ambulatory surgery center and on-site rehabilitation services. Harris provided HVAC, plumbing and medical gas services for the facility, including operating rooms, MRI and therapy pool.
Manufacturing greatly increased Harris’ installation speed and efficiency. The team manufactured the center’s VAV boxes into racks and was able to ...