10.10.22
Harris worked with Standby Systems Inc to fabricate 13 skids for a General Electric propane vapor system to be installed in the country of Ghana, Africa. The skids, which were shipped internationally, contained piping, pumps, valves, heat exchangers, structural frames and supports for the metering and vaporization of the propane.
Framing and piping for the skids were constructed from 304 stainless steel, which quality specifications were required to meet the pressure equipment directive (PED) of ...
Read More
08.11.20
Harris performed the installation of all heating, cooling, and process piping on a nearly 1,000,000 square foot expansion project at the Faribault Foods Plant in Faribault, MN. As part of the project, Harris installed two 1000 BHP boilers, two 550-ton chillers, three cooling towers, three large outside water storage tanks, and all of the other associated pumps and piping specialties related to each of the piping systems installed. Along with this, Harris also ran several thousand feet of steam, condensate, chilled ...
Read More
01.18.17
Harris provided and installed the mechanical equipment and condensate piping for the Phoenix Union Coding Academy. This new, 40,693-square foot school contains classrooms, maker’s lab, divided classroom with moveable walls, two labs and a full gym/cafeteria.
The project included several specialty features which Harris was able to install successfully. For the lab spaces, Harris installed stainless steel lab exhaust ductwork and performed the welding in-place. Some areas required grease ductwork. The gym and maker’s ...
Read More
01.13.17
Harris helped American Airlines renovate their office and data center to adjust to changing business needs. Construction took place in four phases to accommodate the occupants.
One phase of the project scope included removal of seven existing fluid cooler fan sections and replacing them with new fan sections. This work had to be scheduled with the owner so that at least two existing fluid coolers and a redundant cooler were always online. The owner’s data center ...
Read More
01.13.17
This project included the renovation of the existing East Valley Bus Operations Center. Scope of work included removing and replacing 34 existing under-floor air distribution terminal boxes located in the administration building. This work was completed in phases to accommodate staff working in the building during construction.
Scope also included overhead work to install four new supply air ducts and new controls for the under-floor terminal units. All units were tied in to existing BAS and test and ...
Read More
10.31.16
Located on the world-famous Las Vegas Strip, CityCenter is one of the crown jewels of Las Vegas. Project CityCenter is also the largest privately funded LEED project in American history.
Early in the project, Harris was brought on as a design-assist partner. However, as the project moved forward, it became evident that the design team was becoming overwhelmed by the sheer size of the project and the owner looked to the Harris team for help. Harris took ...
Read More
10.31.16
Molycorp Project Phoenix is a remote, heavy rare earth concentrate facility located in Mountain Pass, California. Rare earth material is used in the construction of computers, silicon chips, cell phones, high-yield batteries, military technology and other high-tech applications.
The mining process at Project Phoenix involves technology and processes in use for the first time. The mine’s unique specifications required Harris to adapt new welding procedures as it installed the mine’s tanks and process piping on ...
Read More
05.25.16
Twin Arrows Casino Resort is a five-story, 110-room, 71,630-square foot hotel addition with a 7,548-square foot spa. Harris performed installation of HVAC equipment including a 500-ton air cooled chiller and boiler, outside air and exhaust risers and a vertical and horizontal fan coil unit. Included among the plumbing installations were hot water and chilled water mechanical piping, domestic hot water re-circulation, pump, mixing valve, booster pump, water heaters and a hot water storage tank. Steel was used for mechanical ...
Read More
05.25.16
Tomson Hall was built over the top of the old science building after Regents Hall, a new science building, was constructed. The existing building was almost demolished, leaving only the foundation and columns.
Harris worked with The Boldt Company and Muska Electric to complete this design-build project on-time and under the original budget. Harris designed and installed a complete mechanical system, including plumbing, heating and cooling for this four-story building.
Six air handling units provide ...
Read More
05.25.16
The Old Music Hall now houses mathematics, statistics, computer science offices and computer labs. However, the two top floors are still used as music practice rooms.
During this 14,000-square foot renovation, all old mechanical and plumbing systems were demolished and reinstalled. Additions included a DX unit and air conditioning unit for the computer lab.
Harris eliminated the need for fin tube radiation in several locations by installing air diffusers that were located near the windows ...
Read More