08.11.20
The Secure National Hall project includes the construction of two 500,000-square foot additions to the west side of existing Terminal B-C to house passenger security screening, airline check-in, concessions, restrooms and various information kiosks. Harris will install six custom air handling units along with plumbing in the new guest restrooms. Despite the complexities involved in working in a fully functioning airport, we are slated to complete the project within schedule in 2021.
One challenge met by this project ...
Read More
08.11.20
The Reagan National Airport New North Concourse is a three-level, 230,000-square-foot, $374 million concourse, which is part of a larger $1 billion terminal redevelopment plan at Ronald Reagan Washington National Airport in Arlington, Virginia. The new 14-gate concourse will replace onsite bus service to regional carriers with passenger bridges, keeping travelers out of the elements and giving them easier access to flight information and new amenities like retail, food, an airport club and device-charging outlets. There will also be a new ...
Read More
08.11.20
Harris was chosen to install the plumbing and HVAC for the Prescott VA Mental Health Building. The plumbing systems were cast iron underground waste piping, cast iron above ground waste and vent piping. The domestic water systems are standard copper with re-circulated hot water systems. The systems did not require any special medical gases or special equipment, making installation easier.
On the HVAC side, Harris installed a 48 well geothermal piping system, including site piping to the mechanical ...
Read More
08.11.20
The Phoenix International Raceway project was a combination of three phases; a renovation of the existing grandstands, new grandstands and 13 new buildings located in the infield of the track. Each phase included plumbing, sheetmetal ductwork for the suites, track operations, concessions, kitchens and toilet facilities. The project was scheduled in phases over two years with milestone dates that had to be met before the race events in April and November.
Race day could not be impacted by ...
Read More
08.11.20
Harris performed the complete mechanical installation for Southern Minnesota Municipal Power’s 38.8 MW natural gas-fired power plant in Owatonna, MN. The plant was designed to replace the power generating capacity the city lost during a flood in 2010. The plant consists of four new Caterpillar 10 MW gas-fired generators as well as related piping and equipment.
Harris installed the engine support piping which included air piping, lube oil piping, natural gas piping, used oil piping, glycol piping and cooled ...
Read More
08.11.20
Harris recently completed the Marshfield Clinic Health System’s 200,000-square foot hospital and a 40,000-square foot cancer center expansion. The project includes a new central heating and cooling plant. The clinic’s mechanical systems are currently connected by underground tunnels with the hospital feeding the cancer center from a central chilled water, hot water and medical gas system.
This fast track project was split into two phases with phase one, the cancer center having less than a ...
Read More
08.11.20
Harris was awarded the contract for the new ESPN Studio at The Linq Hotel along the Las Vegas Strip. The project will include 2,300 square feet of new studio space and 2,400 square feet of renovated office space. The new studio will be ESPN’s Vegas hub during major sporting events along with other related content.
Harris will provide both HVAC and plumbing for both the studios and office space. There will be three different studios built that overlook ...
Read More
08.11.20
SLC4 is DataBank’s 3rd data center to open on the Granite Point Campus and became fully occupied within months of opening, a testament to the high-demand for its world-class capabilities. Located in Bluffdale, UT, minutes from downtown Salt Lake City and Utah’s “Silicon Slopes” technology hubs, SLC4 provides 20,000 square feet of raised-floor space, the facility offers network connectivity to over a dozen carriers and cloud providers, as well as access to Granite Point’s own private 66MW ...
Read More
08.11.20
Harris was awarded the HVAC and plumbing package for the new Churchill Downs race and Gaming Facility in Oak Grove, Kentucky. This face-paced project includes a 150,000-square-foot gaming and entertainment venue, a 128-room hotel, race-day and overnight stables, an equestrian center, amphitheater, an RV park and maintenance buildings.
Harris will install 24 miles of pipe and 380,000 pounds of sheet metal duct during the underground plumbing work. This will require approximately 80 craft workers at peak manpower to meet the ...
Read More
08.11.20
The Banner del Web project was a change of the lower floor of the building from a fully exhausted constant volume system to a variable air-volume system with return air. Harris was selected as the prime contractor based on qualifications and approach to execute the project. The project required modifying the existing 168,000 cfm AHU-24 and the replacement of the existing return air handling units. The (2) 200 hp. 84,000 cfm fans were removed from an in-phased plan so one fan could remain ...
Read More